Solar Monitor, little brother of PLC

17.06.2019
The PLC is predestined for consumption management in relation to the power production. Possibility of PLC programming depending on particular... Read More ...

ČESKÝ VÝROBEK (CZECH PRODUCT) Label

20.01.2016
Our products fulfil standards for obtaining the license and they are labelled by the ČESKÝ VÝROBEK (CZECH PRODUCT) logo. Read More ...

Summary of Hybrid System Monitoring

23.02.2015
Hybrid PVP’s manufacturers focus on maximum efficiency in using and storing the output power. However, system for easy monitoring of a particular... Read More ...

Software Bridge for SMA Webbox and SolarMax Maxweb

05.08.2014
If you use the SMA Webbox or Solarmax Maxweb to monitor your PV plant, we are capable to gather data from these dataloggers, handle them and display them at... Read More ...

All Articles

How to install

As we had received numerous inquiries we decided to explain the installation of entire Solar Monitor system so that every owner of domestic PV plant could install the system.

Sensors wiring

Sensors wiring has to meet high requirements concerning working lifetime and reliability. In fact it is a HBUS micro-net with an in-built power supply.

Outside we use heavy-duty PUR cable with industrial M8 connectors.To reduce the cost this cable is changed inside for multiple (6 line) phone cable with 6p6c connectors (RJ-12).

The picture shows particular components.

 

Substantial details of installation

Mounting pad under irradiation sensor

This pad is used to hitch the sensor to the lenghtwise or crosswise support beams of PV panel. The pad is included in each irradiation sensor package.

Fixing apertures can be predrilled to the max dimension of M8.

Irradiation sensor

Fixing to lenghtwise support beams in vertical position. There is a metal sheet pad under the mounting pad to ensure higher stability.

Connectors have to be fixed downwards to ensure optimum measurement.

PV panel temperature sensor

PV panel temperature sensor, fixed by ALU tape to the back of PV panel. ALU tape is included in the sensor package.

 

Electrometer connection

Production electrometer (called „green bonus electrometer“) in PV plants is installed straight after the invertor and measures total energy production. Unlike the invertor it is callibrated and provides accurate data.

Electrometer is connected to the Solar Monitor unit by pulse interface SO. You have to set the number of pulses/KWh produced in the Solar Monitor unit once you connect the electrometer. You can find the values on the electrometer.

The same for three-phase installations.

Data visualization from a solar powerplant in Kuwait

13.09.2019
For the Ministry of Education in Kuwait we have implemented a data visualization from a solar powerplant located at a school in Kuwait.

Solar Monitor accelerating

01.07.2019
Solar Monitor has upgraded its GSM units for generational data transfer acceleration through modern LTE and UMTS networks.

Solar Monitor, little brother of PLC

17.06.2019
The PLC is predestined for consumption management in relation to the power production. Possibility of PLC programming depending on particular situation enables that. Programmability is undoubtedly a huge advantage, nevertheless it also requires the time and cost of development.

Solar Monitor: the gateway to automation of electricity usage

27.03.2019
The article deals with the automation of electricity consumption in relation to its production by means of photovoltaic panels, whose output depends on the sun. Solar Monitor offers an wide range of solutions that adapt very easily to investor's particular requirements.

Smart Energy Forum 2018 Prague

07.11.2018
6th and 7th November 2018, Prague https://www.smartenergyforum.cz/en/ Our presentation about M2M communication, energy gateway for renewables and PLC integration attracted many conference visitors. We explained our solution in details at our booth. See several graphs from a Smart house at South Moravia at end of the presentation: Solar_Monitor - Smart_Energy_Forum - EN.pdf